Then and Now | A challenging vision for the Murray River

March 9 2019 - 3:15pm
SURVEYING THE SITE: A surveyor working at the future site of the Hume Dam before construction commenced in 1919.
SURVEYING THE SITE: A surveyor working at the future site of the Hume Dam before construction commenced in 1919.

Part 2 – Planning a Dam

‘The Narrows’ at Cumberoona, east of Albury, was originally the preferred location for the proposed Upper Murray Storage able to impound 600,000 acre-feet (740 gigalitres). Results of test boring to find bedrock however, were disappointing.

Subscribe now for unlimited access.

$0/

(min cost $0)

or signup to continue reading

See subscription options

Get the latest Wodonga news in your inbox

Sign up for our newsletter to stay up to date.

We care about the protection of your data. Read our Privacy Policy.